
Add to Cart
40x40 Pipe & Tube Seaming Type Roll Forming Machine Several Size
Application
The roll formed product is mor durable than the tranditional ppc pipe, and not easy to aging.
It will make the project more integrate, and help enhancing the image of all project.
Drainpipe bending machine used for bend the roll formed pipe, to connect the drainpipe and the elbowed pipe.
Working flow
Decoiler----feeding----roll forming----cut to length----output table
Components
NO | Name | Unit | Qty |
1 | decoiler | set | 1 |
2 | roll forming mcahine | set | 1 |
3 | electrical system | set | 1 |
4 | hydraulic system | set | 1 |
5 | cutting system | set | 1 |
Parameter
Item | specification |
Voltage | 380v,50/60Hz or as buyer’s request |
Sheet thickness | 0.3-0.5mm |
Control system | PLC |
Cutting type | Hydraulic guide pillar |
Roller material | 45# forge steel coated with chrome 0.05-0.07mm, quenched |
Shaft material | 45# steel |
Width of material sheet | 333mm or customized |
Effective width | According to drawing |
Working speed | 8-12m/min or 20-40m/min drive by servo motor |
Transmission type | Chains or gears |
Cutting blade | Cr 12 mov quenched |
Shaft diameter | 55mm(70mm) |
frame | 350mmH type steel welded |
Main motor power | 5.5kw with cycloidal reducer |
Hydraulic power | 3kw |
Hydraulic pressure | 13mpa |
Raw material | PPGI/GI |
Rollers station | 16 rows |
Main item | Parameter detail |
PLC | Delta(standard) or according to your request |
Inverter | China brand(standard) or according to your request |
Touch screen | Mcgs(standard) or according to your request |
Encoder | China brand(standard) or according to your request |
Voltage/HZ/Phase | 380v/50-60hz/3phase |
Our service
Provide Pre-sales Consultant & On-purchase service 24 hr × 6 days per week
1. Reply within 24 hours
2. Provide relevant product information
3. Answer questions if request
4. Give technical suggestion
Provide After-sales service 24hr × 7days per week
1. Test the machine before shipment
2. Provide technical guidance relate to use the machine
3. Supply one-year warranty period for the machine
4. Provide the spare parts at cost price after warranty period
5. Collect the feedback for the machine working
RFQ
Step 1: Tell us your requirements
Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative
Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract.
Step 4: Advanced payment and production
Step 5: Factory Examine Goods/ rectify and reform to meet the requirements of contract.
Step 6: Balance payment and shipping
Step 7: Handing Shipping files to help clients get goods from transporter in time.
Step 8: Clients get goods and go into warranty time.