
Add to Cart
Metal Steel W Beam Crash Barrier 5mm C Post Highway Guardrail Roll Forming Machine
Working flow
Decoiler-----feeding----- leveling ------roll forming ------ punching-----cutting----output table
Machine Component
De-coiler | 1 set |
Leveling device | 1 set |
Forming machine | 1 set |
punching device | 1 set |
Cutting device | 1 set |
PLC control box | 1 set |
Hydraulic pump station | 1 set |
Production support table | 1 se |
Decoiler
Type | Manual type(standard) | Hydraulic type(option) |
Photo | ||
Width | 600mm | 800mm |
Capacity | 5000kgs | 5000kgs-15000kgs |
Inner diameter | 450-550mm | 450-550mm |
Outter dimater | 1500mm | 1800mm |
roll forming machine
Material Thickness: 0.3-0.8mm PPGI and GI
NO. of roller Stations: 14groups
Material for Rollers: high grade Gcr15 steel polished and coated with chrome HRC55-60°
Material for shaft: high grade 45# steel polished and coated with chrome HRC55-60°
Diameter of shaft: 90mm
Frame panel thickness: 20mm
Bottom frame: 36# H-section steel
Motor Power: 22kw
Driven type: Chain or gear box
Speed:8-12m/min
Punching device
Item | Parameter detail |
Photo | |
Frame processing | the whole levelling surface is made by drilling machine |
Mould material | Cr12mov |
Mould processing | wire eletrode-cutting for the mould shape, it will save pressure |
Hole size | According to your request |
Hole number | According to your request |
Pressure | 20Mpa |
Cutting device
(1) Material for Cut-Off Modular:Cr12 steel
(2) Hardness for Heat Treatment:HRC55 – 60
(3) Cut-Off Type: Hydraulic, Automatic Cut-Off
(4) Cut-Off Modular:1 set
(5) Motor for Hydraulic Stand: 11 kw
Stacker
Type | Manual | Auto(option) |
Length | 2pieces, length is adjustable | according to your requirement |
PLC
Main item | Parameter detail |
PLC | Delta(standard) or according to your request |
Inverter | China brand(standard) or according to your request |
Touch screen | Mcgs(standard) or according to your request |
Encoder | China brand(standard) or according to your request |
Voltage/HZ/Phase | 380v/50-60hz/3phase |
Hydraulic pump
Main Item | Parameter detail |
Motor | 3kw China brand or according to your request |
Pump | China brand or according to your request |
Solenoid valve | China brand or according to your request |
Cooling system | Cooling fan |
1) FOB Tianjin Port or CIF
2) Payment: 30% T/T deposit, and pay the balance before shipping.
3) Delivery time: 60 working days.
4) Guarantee period: 18months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
6) Installation and training:
1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.
2. Without visiting, we will send you user manual and CD to teach you to install and operate.
3. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 100 one man one day). To the seller’s appointed account by T/T before the seller’s technicians go to the buyer’s factory. The buyer pays the seller’s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.