
Add to Cart
Metal Steel Profile W Beam Crash Barrier Highway Guardrail Roll Forming Machine
One machine produce two profiles, 2 beams and three beams,rollers on shaft, when change different profile, just take off the whole groups rollers.
Working flow
Decoiler-----feeding----- leveling ------roll forming ------ punching-----cutting----output table
COMPONENT FOR Highway Guardrail/Traffic Barrier Forming Machine | |||
Name | Quantity | Units | |
Decoiler | 1 | Set | |
Main Machine | Feeding device | 1 | Set |
Roll forming system | 1 | Set | |
Cut Equipment | 1 | Set | |
Hydraulic system | 1 | Set | |
Electric control system | 1 | Set | |
Supporter/Automatic Stacker | 1 | Set |
Type: Hydraulic
Capacity : 5Ton -10Ton
ID-OD: 450~508mm
Max width: 1250mm
Above parameters can be designed as your needs .
We also have manual type for free .
Roll forming machine
Material Thickness: 0.3-0.8mm PPGI and GI
NO. of roller Stations: 14groups
Material for Rollers: high grade Gcr15 steel polished and coated with chrome HRC55-60°
Material for shaft: high grade 45# steel polished and coated with chrome HRC55-60°
Diameter of shaft: 90mm
Frame panel thickness: 20mm
Bottom frame: 36# H-section steel
Motor Power: 22kw
Driven type: Chain or gear box
Speed:8-12m/min
Cutting device
Usage : To control machine cutter work
Power: 5.5kw
Solenoid values
Hydraulic cutting type
Control system
PLC : Delta or custom brand
Screen : Touch screen
Language: English ,Chinese
1) FOB Tianjin Port or CIF
2) Payment: 30% T/T deposit, and pay the balance before shipping.
3) Delivery time: 60 working days.
4) Guarantee period: 18months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
6) Installation and training:
1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.
2. Without visiting, we will send you user manual and CD to teach you to install and operate.
3. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 100 one man one day). To the seller’s appointed account by T/T before the seller’s technicians go to the buyer’s factory. The buyer pays the seller’s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.