
Add to Cart
Metal Walk Panel Scaffolding Board Making Roll Forming Machine
Scaffolding, also called scaffold or staging, is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other man made structures. Scaffolding is also used in adapted forms for formwork and shoring, grandstand seating, concert stages, access/viewing towers, exhibition stands, ski ramps, half pipes and art projects (quotoed from wiki). Now the metal ladder scaffolding for concrete slab and masonry construction
1.Machine Components
S.N | Equipment name | Quantity |
1 | 3T hydraulic un-coiler | 1 set |
2 | Leveling device 600mm | 1 set |
3 | Servo feeding device 600mm | 1 unit |
4 | Press machineJH21-125 | 1 unit |
5 | Main roll forming machine 20 stations | 1 set |
6 | Cutting holder | 1 set |
7 | Hydraulic station | 1 set |
8 | Control system ( including control box) | 1 set |
9 | Conveyor Out table | 1 unit |
10 | Spare parts | 1 package |
11 | Drive system | 1 set |
12 | Cutting dies | 2 sets |
13 | Punching die set | 2 sets |
2.Technical Parameter
Machine perfomance
The thickness of material sheet | 1.2-1.5mm,the product drawings need to be confirmed by the buyer |
The width of material | 250≤§≤4500mm |
Product speed | 0-8m/min |
Occupy groud area | length 30m xwidth 3m |
Total power | about 46kw |
Power | 220V, 50Hz, 3 phase |
Decoiler
capacity | 4T |
Inner diameter material roll | 480~520mm |
Outter diameter material roll | ≤1500mm |
Leveler
Motor | 5.5KW Frequency conversion motor |
Shaft dia | 90mm |
Roller material | 40Gr |
Hardness | HRC25°-27° |
Motor power | 3KW |
Speed | 8m/min. |
Drive mode | chain plus vector wheel |
Servo Feeding machine
Drive | 3 kw Servo motor |
Roller material | GCr15 |
Roller heat treatment hardness | HRC55°-57° |
Speed | 0-10/min. |
Punching machine
Material of mould | Cr12Mov, Quenching,Hardness:HRC58-62º |
Quantity of punching dies | 1set |
Punching frequency | 45 times/ min. |
3. Payment Term and condition
* Payment Term: 30 T/T in advance, 70% T/T before delivery
* Delivery Time: Within 30 Days after receipt of the down payment
* Warranty: 18 month and life-long maintainance
*Installation and debugging: We will send professional engineer to make installation and debugging, Buyer pay our engineer each one 100 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 5 days
* Transporting: 1x40ft container
4. Advantage
1. Convenient transportation: our factory is located in Cangzhou city, closed to Beijing City, which provide short time and low-cost transportation expenses for you.
2. Full range of products: we can provide all kind of roll forming equipment which can be used to forming all kinds of shape as you required. The company can make non-standard products for client's requirement.
3. Specialized: There are specialized technical personnel and a list of experienced team responsible for quality assurance. Here are technical and skilled specialists, senior foreign trade staff and engineers.
4. Advanced and practical: For example, wall/ roof panel roll forming equipment solves the problem of roof leakage that conventional machine can not be able to handle with.
And also, the forming machines are national inspection-exempted products after external supervision and sampling inspection.
5. Professional and on time service:
As to pre-sale service, the company provides sample version for free. Well, that which party bears freight charges is consultative.
As to sales service, our company offers sales discounts and allowances to customers for the vulnerable parts. There is about 3-month delivery cycle from the beginning of orders. Foreign delivery cycle is almost the same as domestic one.
As to after-sale, there is one-year warranty period. During the warranty period, machine maintenance and repair will be provided for free.
What's more, our company can offer OEM business and provide simple for free for customers with our roll forming equipment and slitting line, cut to length line.
5. Packing and Laoding:
Before loading to the container, we will check the machine first
Second, make some protection on the machine, Such as, we will mpaint the coil on the roller and shaft, in case the roller and shast got corrosion and rusty during long time delivery
Third, we will make the plastic package on the easy damage parts, and fix all the parts into container by the steel wire rope, and ensure the machine will not damage when shaking on sea.
At last, we will take photos for customer when loading to container
Guarantee of Quality
The Seller shall guarantee the goods with materials and workmanship in accordance with the required on the drawings, brand new, unused and correspond in all respects with the quality, specification and performance as stipulated in drawings and guarantee a good smooth operation for 18 months after date of shipment (except consumables). This guarantee excludes the parts that require the normal plant maintenance. The guarantee is strictly limited to the repairing and the replacing of the mechanical parts supplied by us found to be defective provided that failure has occurred during the ordinary use of the equipment and it is not accepted and claim due to damage to people, property or loss of production.