Add to Cart
Specifications:
Raw material :GI, cold plate | |
equipment operating | fully automatic computer control |
track processing specification(mm) | 40-150mm |
stud processing specification (mm) | 40-150mm |
Raw material of thickness | 0.5mm-1.0mm |
Production speed | About 25m/min |
Levelling rollers | 11 steps |
Diameter of levelling rollers | 60mm |
Main forming rollers | 11 steps |
The diameter of forming rollers | 60 mm |
Material of the rollers | 45# steel |
Auxiliary device | 6 steps regulating wheel |
Material of shaft/wheel | 45 forged steel |
Size of main machine(mm) | 7.9m x 1.5m x 1.6m |
Weight of main machine | About 10 Tons |
Hydraulic motor power | 15kw |
PLC control system | Delta brand |
The material of cutting blade | Cr12 |
Machine body | 400 H steel |
The model of changing sizes | Computer control automatic change size |
cutting model | Automatic cutting |
punching model | Automatic punching |
Product support frame | 6m |
Details:
Manual Deoiler
(1)Material coil inner diameter: 450mm-550mm
(2). Max coil Width:300mm
(3). Carrying capacity: 1.5T
Main Forming Machine
Material of Main Equipment Roller Material: High grade No.45 forged steel, with digital-controlled procession, Plated with hard chrome. Active Shaft Material: High grade No.45 carbon wrought steel,which can improve the integrated mechanic feature of the shaft. Shaft diameter is 50 mm.
Cutting System
(1)Blade and punching mold material: Cr12MoV steel with quenched treated 60-62℃
(2)Cutting system: Advanced hydraulic drive, automatic cutting after forming, no distorting or wasting, high level safety factor.
(3) Punching: automatic punching before forming, three round hole can be done separately.
(4) Oil pump one set
Sales Terms
Payment Method
30% as deposit ,balance payment after inspection while before delivery.
Production Period
30 days after the 30% deposit.
Packing Method
Nude packing in the 40 feet container ,fixed well with oil rope, control cabinet and all the accessories with waterproof.
After-sell Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation
If installation is needed, the seller will dispatch a technician to the buyer’s factory abroad to assist regulating the machine with charge free. The buyer should assist the seller to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Position the machine in the buyer’s factory.
Prepare necessary electric wiring.
Prepare material of trial running.
Provide labors for assistance and installation during installation.
Machine Picture