
Add to Cart
Software Computer Control Light Steel Keel Roll Forming Builduing Machine
1. What is the technical parameters of the machine?
Technical parameters: | ||
1 | Hydraulic motor power | 3kw,4kw |
2 | Hydraulic Pressure | 10-12MPa |
3 | Voltage | 380V /3phase/ 50 HZ (or as your requirement) |
4 | Cutting drive | Decelerating motor + Chain drive gear all by high-frequency |
5 | Control System | Software Computer Control |
6 | Length measurement | Encoder |
7 | Main Frame | 300mm/350mm H-Beam or 350mm |
8 | Backboard Thickness | 17mm/20mm |
9 | Chain Size | 1inch/2inch |
10 | Feeding Material | Better as your drawing or from our designer |
11 | Feeding Thickness | 0.18mm-0.8mm |
12 | Effective width | Better as your drawing or from our designer |
13 | Productivity | 20-50m/min |
14 | Roll Station | 10rows(according to different design) |
15 | Roller Diameter | 40mm(depend on different design) |
16 | Roller material | 45# steel |
17 | Cutter material | Cr12 mould steel heat-treated hardness of HRC = 60-62 degrees |
18 | Total Weight | 2t-12t |
19 | Package of machine | Waterproofing membrane, standard export packing |
20 | Roll fromiomg machine of theComponents | Manual decoiler-------------------1 set(5t) Guiding Platform------------------1 set Main Machine of Roll Forming------1 set Hydraulic Station------------------1 set Supporter Table-------------------1 set |
21 | machine technical parameters can be changed, according to customer's need. |
2. light keel steel framing roll forming machine
Help you create a light steel system which is not only suitable for Chinese market but also suitable for international market.
Europe, America, Japan, Korea Villa:
Light steel + softness heat preservation + interior & exterior decoration = blended light steel villa
China Villa:
Light steel + blended heat preservation + interior & exterior decoration = blended light steel villa
China Villa are used steel-concrete instead of concrete, the main market of light steel villa are base on big thickness and strongness of wall.
3. Payment terms and after-sale service:
1) FOB Tianjin / CIF your port
2) Payment: 30% T/T deposit, and pay the balance before shipping.
3) Delivery time: 60 working days.
4) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
6) Installation and training:
1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.
2. Without visiting, we will send you user manual to teach you to install and operate.
3. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 100 one man one day). To the seller’s appointed account by T/T before the seller’s technicians go to the buyer’s factory. The buyer pays the seller’s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
Different Software Optional
You can choose different software, which reduces your investment risk