
Add to Cart
4m/min Glazed Roofing Tile Roll Forming Machine For Roof Building
Working flow:
Decoiler---Feeding&Guiding---Roll Forming---Hydraulic Pressing&Cutting---Receiving Table
Machine production:
1. Un-coiler: 5 tons passive | ![]() |
1. Pressing and cutting way: Hydraulic cut. | ![]() |
1. Material Thickness: 0.3-0.8mm PPGI and GI 2. Material for Rollers: high grade 45# steel polished and coated with chrome HRC55-60° 3. Material for shaft: high grade 45# steel polished and coated with chrome HRC55-60° | ![]() |
1.Length & quantity controlled by PLC Length inaccuracy can be amended easily. 2.Control panel: Button-type switch and touch screen 3.The language in the touch screen: English and Chinese 4.Unit of length: millimeter (switched on the control panel) | ![]() |
1.Motor power: 3 kw | ![]() |
| ![]() |
Technology parameters
1 | Suitable raw material | PPGI/PPGL/GI/GL Steel Coils |
2 | Thickness of coil sheet | 0.3-0.8mm |
3 | Feeding Coil width | 1000mm/1200mm |
4 | Effective width | 800mm/1000mm |
5 | Under frame | 350H-beam |
6 | Diameter of Soild shaft | 70mm, high grade 45# steel, finish turning, cylindrical grinding, with keyway |
7 | Roller | High grade 45# steel, processed by CNC lathe, Quenched and tempered treatment, hard chrome coated 0.05-0.07mm |
8 | Thickness of middle plate | Guide pillar memorial archway |
9 | Forming stations | 16 |
10 | Drive type | By chain(1.0 inch) link bearing model 6210 |
11 | Power of main motor | 4kw with Cycloidal reducer, Lichao, Shanghai |
12 | Power of pump station | 4kw, Lichao, Shanghai |
13 | Forming speed | About 15-20m/min |
14 | Hydraulic cutting | Controlled by PLC |
15 | PLC | DELTA, TAIWAN / Mitsubishi, Japan |
16 | Material of cutting blade | Cr12Mov, quenching 58-62℃ |
17 | Frequency converter | It has the advantage of slowing down before cutting, to ensure the length accuracy(±1mm, far better than industrial standard ±3mm). |
18 | Switch | CHNT |
FAQ:
A: Please look at my contact card. You can talk to me anytime. Or send me enquiry email, I will reply you in 24 hours and offer the optimum solution to you
A: Engineers available to service machinery overseas. But the customers/buyer should pay for installation and commissioning fee 100$/day to our point account. We will provide the technical support for the whole life of the equipment and free training.
A: 1.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.A: Our company has been producing roll forming machines for almost 20years.We have rich experience for manufacturing and designing the machine.